Discover

the rich history and culture of Kazakhstan

 

Painting: “Construction of the Shardara Hydroelectric Power Station”

Loading images...

Description

The Shardarynskoye Reservoir and the construction of the hydroelectric power station are depicted in the painting. The copy is created with oil paints on canvas. The construction of the HPP began in 1958 and was completed in 1967.

Date: 2017.
Materials: canvas, oil paints.
Technique: oil painting.
Size: 60×130 cm.

Dating period: 2017 ж.
Material: Canvas, Oil
Technique: Oil painting
Size: 60х130 см.
Scroll to Top